Last Monday, work began on the requalification of the EB1 School, No. 5 in Olhão, which includes new construction, rehabilitation and refurbishment work. The main objective of the design was to adapt the building from the beginning of the 20th century [Estado Novo] to...
On the 5th, Protecna presented the Self-Protection Measures (MAP) carried out under the public contract signed with the Municipality of Loulé for the preparation of MPA’s for kindergartens and basic schools of the 1st, 2nd and 3rd cycle of the municipality. ....
A Protecna está a realizar Relatórios de Vulnerabilidade Sísmica. O seu corpo técnico constituído por Mestres em Engenharia, coordenados por um Especialista em Estruturas da Ordem dos Engenheiros, recorre a softwares de análise linear e não linear para análise...
Protecna is carrying out Seismic Vulnerability Reports. Its technical staff, made up of Masters in Engineering, coordinated by a Specialist in Structures from the Order of Engineers, uses linear and non-linear analysis software for structural analysis of the existing...
Protecna prepared the execution projects for the stabilization of a slope that included a reprofiling and retaining wall, in Alte, whose promoter is the Municipality of...
On the 18th, the opening of the EB1 school n.° 5 in Olhão took place. Protecna contributed to the elaboration of Specialty Projects for the execution of the work. ...